Frame one-story house with a 6x4 terrace. Projects of frame houses with a terrace

    What has been done

    Project: the Innsbruck project was adapted to the site and the wishes of the Customer's family, and a solution was proposed to move the terrace.
    foundation: based on geology and the architect’s calculations, the house was built on a pile-grill foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - reinforced concrete floor slabs.
    box: walls made of aerated concrete blocks, masonry with masonry glue. Windows are made to order, with one-sided lamination, installation on site.
    roof: metal tiles.
    exterior decoration: the walls are insulated with basalt facade insulation and plastered, the finishing elements are made of wood, made locally, based on technical specifications visualization, painted. The base is laid out decorative stone.
    interior finishing: finishing was carried out according to the design project, where the combination was taken as the basis decorative plaster with stone and wood. False beams were installed on the ceilings.
    additionally: a fireplace has been installed and finished.

    What has been done

    This is the very case when our Customer and we speak the same language and are inspired by the ECO high-tech style! Designer Ilya came to us with a ready-made Project for his future home! Our team liked the project - it’s so unusual and stylish solutions It's always a professional challenge!
    We prepared estimates for Ilya and developed unique constructive solutions- all this allowed us to implement this project! The frame house is made in our proven Canadian technology with 200 mm insulation along the entire contour! The outside of the house is sheathed with imitation timber. All windows are custom-made and laminated in colors according to the project. Additional accents are placed thanks to professional painting of imitation timber and selection of paints.

    What has been done

    What does it cost us to build a house? Indeed, having a team of professionals and knowledge, building a house from scratch is a matter of time! But sometimes the task is more difficult! We have introductory ones - an existing foundation, or buildings on the site, extensions to existing buildings and much more! For the Matsuev family, this was precisely the difficult task. They had a foundation from an old burnt house, and a landscaped area around it! The new house had to be built in a short time on the existing foundation. Dmitry and his family had a desire to build new home in high-tech style. After careful measurements, a design was made that took into account the old layout, but had a new one modern form with interesting innovations! appeared at home entrance group, where you can sit at a table on cozy evenings and a complex but possible exploitable roof in our area. To implement such a roof, we called on our knowledge and modern building materials LVL beams, built-up roofing and much more. Now in the summer you can have an unusual dinner on such a roof or watch the stars at night! In the decoration, our architect also emphasized the minimalistic and graphic high-tech style. Smooth plastered walls with painted plank details, and wooden beams at the entrance added personality. The inside of the house is decorated with imitation timber, which is painted in different colors depending on the purpose of the room! Large windows in the living room kitchen overlooking the site - created desired effect illumination and airiness of space! The house of the Matsuev family has graced our photo gallery in the section of country architecture in the high-tech style, a style chosen by brave Customers with excellent taste.

    What has been done

    Olga and her family have long dreamed of a country house! A reliable, solid home for living that will fit perfectly into their difficult narrow area! With the advent of children, it was decided to make the dream come true; children grow quickly and in own home There are many opportunities in nature and fresh air. We, in turn, were glad to work on an individual house project in classic style made of red brick with a bay window! After the first acquaintance with our company in a cozy office, we invited Olga to take a look at our existing construction site: evaluate the order and construction processes, storage of materials on site, get acquainted with the construction team, and make sure the quality of the work. After visiting the site, Olga decided to work with us! And we were glad to do our favorite job again to make another country dream come true!

    What has been done

    Project: changes were made to the San Rafael project and redevelopment was made according to the wishes of the Customer.
    floors: basement - reinforced concrete floor slabs; interfloor - reinforced concrete floor slabs
    box: walls made of expanded clay concrete blocks, masonry with mortar??? Windows have been installed.
    roof: metal tile
    terrace: rough fencing elements have been completed, flooring has been installed.

    What has been done

    Dmitry contacted our company with an interesting preliminary design to calculate the cost. Our experience allows us to perform such calculations based on preliminary designs with minimal errors, no more than 2%. Having visited our construction sites and received the cost of construction, Dmitry chose us from many of our colleagues in the workshop to complete the project. Our team began to carry out a difficult and expressive country project with spacious premises and garage, large windows and complex architecture. After the project was completed, Dmitry chose us as a contractor company, and we, in turn, wanted to do further work on the same high level! Since the object is large, Dmitry proposed stage-by-stage cooperation, namely, upon successful completion of the foundation work, we began the second part of the project - walls + floors + roofing. Also important for Dmitry exact dates construction, in order to speed up the construction processes, the team was reinforced by 2 experienced masons.
    The box on a pile-grillage foundation was delivered right on time! The result pleased us and the Customer. All stages of the work were coordinated and worked out for Dmitry and his individual project, which benefited all participants in the process!

    What has been done

    Project: The project of our company Inkerman was changed taking into account the wishes of the Customer’s family, the house was planted on the site, taking into account the existing situation on the site and the relief
    foundation: based on geology and the architect’s calculations, the house was built on a reinforced pile-grillage foundation.
    ceilings: wooden wooden beams, in places of large spans, installation of LVL beams. Basement ceiling insulated basalt insulation in 200mm; interfloor covering with 150mm sound insulation.
    box: box: walls made of expanded clay concrete blocks, masonry with mortar. Windows have been installed.
    roofing: installation of metal tiles.
    external finishing: the facade is insulated with 100 mm basalt facade slabs, the facades are closed facing bricks; color scheme proposed by the architect and agreed with the Customer.

    What has been done

    The Krutov family decided to build a spacious house for the whole family to live in!
    Olga and other family members went from idea to implementation in several stages! Choosing a technology, working on a project for a long time, building a foundation, building a house with exterior finishing and then working on interior decoration! Frame technology was chosen as energy-saving, prefabricated and high-tech! Why did the Krutovs choose our company? They were pleased with the quality of work on our construction site and the workers who gave us a detailed tour! We also worked on the estimate for a long time, combining different options finishes, comparing their costs. This allowed me to choose best option from a wide variety finishing materials and complete sets.
    The project was created by an architect friend, but we had to work out the constructive part of it. After which the most reliable and effective foundation was erected - USHP. Next, work began on the box. A frame house with 200 mm insulation along the entire contour and a unique roof insulation technology of 300 mm. For the exterior decoration, siding was chosen in a spectacular combination of colors - coffee and cream. Accents are placed thanks to powerful roof overhangs, an interfloor belt and large windows!

    What has been done

    When you decide to become the proud owner own home and move to a new home for permanent residence, first of all you think about what the house will be like; what to build it from; how much will it cost and most importantly, WHO will do all this?
    Alexander, came to our company with the desire to move to his own country house. He liked the Avignon project and there was already a strip foundation. After the initial visit to the site, measurements and inspection of the foundation, we gave our conclusions and recommendations. Strengthen the foundation, change the project and adapt it to the size of the existing foundation! After agreeing on the cost, it was decided to build in winter. Alexander received a gift of reinforced concrete floors, one of the leading construction teams and a house according to the design he liked, which stood on a plot with exterior finishing by spring! Alexander observed every stage of construction, regularly visiting the construction site and was pleased with the result, and we were pleased with our work. This is an individually designed Avignon project, implemented in stone technology with external insulation and siding finishing!

    What has been done

    Each house is a separate story of creation and implementation! One day we built a house good people and they recommended us to someone else to a good person! Rumyantsev Andrey came to our company with a desire to replace the old country house to build a one-story spacious country house with a fireplace for warm family evenings... It was decided to build the house from aerated concrete blocks so that the future country handsome man would delight the owner for decades! The customer voiced his wishes for finishing - and we, in turn, brought everything to life. Thanks to detailed visualization of the project, each element of the exterior decoration is a member of a friendly ensemble! Bavarian masonry, as the final stage of exterior decoration, looks noble and thorough. Without a doubt, such a tandem - aerated concrete and brick can be safely called the best solution in the field of stone house construction - warm, affordable, beautiful, reliable. Modern technologies have stepped forward so much that such unique configurations become available in a short time, because we built this project in winter months. The main thing is to own the necessary knowledge and constantly replenish their stock!

    What has been done

    Project: the project of a European company was taken as a basis and was adapted to the site and the wishes of the Customer’s family; a terrace and patio were proposed, taking into account the cardinal directions on the Customer’s site.
    foundation: based on geology and the architect’s calculations, the house was built on a pile-and-grid foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - wooden on beams with a 150 mm sound insulation device.
    box: walls made of aerated concrete blocks, masonry with masonry glue. Windows are made to order with one-sided lamination, installation on site.
    roof: metal tiles.
    Exterior finishing: the walls are insulated with basalt facade insulation and plastered. Based on visualizations added façade panels under the Tolento stone. The enclosing elements of the terrace and balcony are made of wood, made locally, based on technical specifications visualization, and painted. The roof overhangs are lined with soffits matching the color of the roof.

    Vladimir Murashkin,

    The owner of a house “brought to life according to his idea and sketch!”

    House parameters:

    What has been done

    When Customers come to us with bright, modern ideas future home, we light up doubly! After all, working on a new stylish project is always interesting and a challenge, how to implement all the bold ideas from a constructive point of view, what materials to use? Vladimir bought a plot of land with picturesque views of the Oka bank! This view could not be ignored, so an indispensable attribute the future home has a dizzying terrace (51.1 m2) and a large balcony, focused on beauty! Vladimir wanted to relax in nature in wooden house, and it was necessary to build a house in a short time and ideal solution became for such tasks frame technology construction! If we’re going to be different, it’s in everything! The house was made even more spectacular by the vertical finishing of imitation timber made of durable larch, painted in natural shades with emphasized wood texture. Laminated windows complement the modern look of the house! It turned out to be an excellent country house, with highlights and at the same time incredibly functional.

    It all started with individual project, found by the Customer’s family on a European website. It was with him that she came to our office for the first time. We did preliminary calculations on the project, took a tour of the active construction site, shook hands and work began to boil! The architect improved and adapted the project to the site and the Client’s family; the foreman “planted” the house on the site. Based on geological surveys, it was decided to place the house on bored piles. The frame grew in a few weeks, then the roofing, insulation, exterior finishing! For winter period a house grew on the site. The customer invited a third-party technical supervisor who monitored the process independently of our multi-stage control. The color scheme for painting the imitation timber was selected by our manager and here in front of us is the bright and cozy country house of the Pushkov family’s dreams!

Built country house using frame technology plus a small veranda. The cost turned out to be quite economical, and the time frame was 3 and a half months. We even finished it a couple of weeks earlier than promised. We only go to the dacha in the summer, so I can’t say anything about thermal insulation. Thank you

Thank you very much for building a house made of aerated concrete. The quality of both the material and work is excellent - FRIENDS WILL BE JEALOUS. The time frame for completed work is approximately 4.5 months. empty space the house was built. Good luck to all of you, good clients And big houses!!


They built our house in 3 months (they started the foundation at the end of summer, and finished the walls and interior decoration), it didn’t turn out cheap, but everything was thought out, our participation was minimal. This year we are building a bathhouse together with them! Thank you for such professional guys that you provided us with!


Thank you so much for your work and attitude! Everything is efficient, high quality, fast! Thanks to the team led by Alexey!


The company built me ​​a great one summer house! I don’t have any complaints about the company; next summer I’m going to build a bathhouse and a garage. I’ll definitely contact them. Thanks to everyone, especially Sergei’s team, who built it for me, a lot depends on them!


We built a house from aerated concrete in your company - I’m very pleased. The house was erected on our pre-prepared foundation in 45 days. And as a gift we received home insurance for a year. So I recommend it.


In August 2017 I ordered the foundation ( monolithic slab) for a house in the Leningrad region. In 2018 I already ordered the house itself. I can recommend it because... We were pleased with the result. Everything was done quickly and professionally.


We ordered a house and garage from this company in the summer of 2016. The builders worked for about 4 months, without a break (they really liked it). Everything was done according to the agreement, no extra money was asked.


Frequently asked questions before construction

About the company

How long has your company been in business?

Our company began work as a repair and finishing company in 2007. From that moment on, we have grown into the construction industry and all thanks to our employees. Special thanks for the work invested in the development of the company.

How is the competence of specialists confirmed?

All architects and engineers of the company have qualification certificates. Because the project is not subject to a company license, but to an architect’s certificate. By law, responsibility for the project lies with the architect.

Does your company do all the work? Or do you use contractors?

  • We ourselves carry out general construction, finishing work, site arrangement, wiring of engineering systems (electricity, heating throughout the house, water supply) and so on.
  • We invite contractors to work that we do not perform every day and require specialization, for example: production and installation of windows and doors (special orders), air conditioning systems, boiler room equipment, installation of wells, septic tanks.
  • Searching, attracting, complying with agreements and monitoring the performance of work by contractors is our task.
  • We carry out 80% of all work on the construction of your home ourselves and only 20% involve contractors.
  • We enter into an agreement with each contractor in which he specifies a guarantee for the work performed by him, and in case of malfunctions, their elimination is the responsibility of the contractor.

Is it possible to see objects that are currently in operation?

Yes, there are objects that we can show at different stages works and already completed houses by prior arrangement.

About the project

Should I buy a standard project or order an individual one?

Buy finished project.

  • Plus is the price.
  • The downside is that it will not include all your wishes regarding materials and layouts. Also, it will require modification to suit the characteristics of your site.

Buy a ready-made project and modify it.

It all depends on the changes you want to make. It is possible that developing an individual project will be more profitable for you than modifying a standard one.

The cost of such modifications must be discussed during the meeting.

Development of an individual house project.

  • Pros: all your wishes regarding all characteristics of the house and site are taken into account.
  • The downside is that the cost of such a project is higher than a standard one.

BUT! You can develop an individual project for free. If our company builds, then the development of an individual project is free for you.

How is an individual project developed?

  • The development of an individual project begins with the signing of a contract and the first meeting with the architects, at which the client voices his wishes. Based on the results of the meeting, a design assignment is drawn up, which is an annex to the contract.
  • Architects prepare several versions of sketches and decide with the client in which direction to move next. During the entire design period, several meetings take place with the client, at which all architectural and design solutions are worked out in detail until the client is satisfied with everything, which he confirms with a signature on the Draft Design.
  • Next, a working draft is developed. This is the calculation phase of each design solution in which the client is not involved.
  • This entire process takes from 2 weeks to 2 months, after which the client receives a finished project with ready-made detailed calculations, which is necessary when submitting documents for a building permit.

About construction

Will you go to the site where construction is planned?

Yes. When inspecting the site, we take into account the size, access from the road and its width, the proximity of neighboring buildings, the presence of a slope or drop, cardinal directions and what kind of soil is on the site.

Do you help with choosing a site for construction?

Yes. Our specialists help with site selection. They will help you find it according to your requirements on the Internet with advertisements.

What affects the final price of a home?

The cost of building a house is affected by:

  • site features: relief, entry conditions, location
  • materials used in construction
  • house architecture features
  • work conditions (working time restrictions)

What guarantees do you provide?

We provide a 3-year guarantee on our work. The manufacturer provides a guarantee for materials and it is different in each case. There are materials for which the manufacturer provides a lifetime warranty.

How can I control construction?

  • We send each client step by step photo work report.
  • We install online video surveillance of the facility 24 hours a day, you and the company’s specialists have access to it (paid service).
  • You can also use the services of companies that provide technical control.
  • The construction is carried out in stages, you always see which stage and only after accepting one, we proceed to the next.

When is the contract signed?

  • The design contract is signed at the meeting, before the first communication with the architect.
  • The construction contract is signed after the estimate has been developed and approved.

When should I pay for your work?

For design, an advance payment is required within 5 days after signing the contract in the amount of 70% of the total amount. The balance is paid upon delivery of the finished project to the client.

Payment for construction is broken down according to the stages specified in the estimate. Each stage of construction is also divided into payments, the size of which may vary (usually due to the need to purchase materials)

How are builders placed?

  1. It will be convenient if you have the opportunity to place builders near the construction site, it will be suitable garden house, construction trailer, old house or any other building with a roof.
  2. If there is nothing like that, then we are ready to bring our change house for FREE.
  3. In extreme cases, we will accommodate our builders in a nearby hostel

What communications are needed to start construction: electricity, water?

Electricity with a power of at least 5 kW and technical water.

If this is not the case, then we will bring our generators FREE OF CHARGE. Water in most cases wood construction used only for household needs, we will provide its delivery on our own.

What time of year do you carry out construction?

We build all year round, one of important conditions in the spring-autumn period this is a suitable road for vehicle access.

WHAT CAN WE DO FOR YOU?

We will help you save by correctly calculating the estimate and choosing high-quality materials.

Complete high-quality design documentation, thanks to which you can not worry about the design decisions made.

We work throughout the Moscow region

Volokolamsk district, Voskresensky district, Dmitrovsky district, Egoryevsky district, Zaraisky district, Istra district, Kashirsky district, Klinsky district, Kolomna district, Krasnogorsky district, Leninsky district, Lotoshinsky district, Lukhovitsky district, Lyubertsy district, Mozhaisk district, Mytishchi district, Naro-Fominsk district, Noginsk district, Odintsovo district, Ozersky district, Orekhovo-Zuevsky district, Pavlovo-Posadsky district, Podolsk district, Pushkinsky district, Ramensky district, Ruzsky district, Sergiev Posad district, Serebryano-Prudsky district, Serpukhov district, Solnechnogorsk district, Stupinsky district, Taldomsky district, Chekhovsky district, Shatursky district, Shakhovsky district, Shchelkovsky district.

A house with a terrace is always the embodiment of comfort, family warmth and hospitality. Construction company"Russian Houses 53" offers its clients frame houses with a turnkey terrace. We implement standard projects presented in the catalog, and are also ready to review and calculate individual plan customer.

Housing that is affordable and attractive in appearance is characterized by comfort and durability. In addition, frame technology is successfully used throughout the year, and the construction of a house that does not have shrinkage requires a matter of weeks or even days.

Our strengths

Contacting us to buy frame house with a terrace, you act thoughtfully and correctly. “Russian Houses 53” offers better equipment than its competitors in the market and, with consistently high quality, provides the most favorable conditions.

  • The frame of the house is a structure made of timber with a thickness of 100x150 or 150x150 mm.
  • Lumber and structural elements are made from high-quality wood on the company's Russian production lines.
  • The supply of building materials is carried out from the company’s own enterprise “Russian Homes 53” in Novgorod region. The first 500 km from Pestovo to the destination is absolutely free for the customer.
  • Delivery is carried out to all regions of Russia.
  • The installation of a frame house with a terrace is carried out by our craftsmen. These are Russian specialists who have sufficient experience and equipment to ensure that construction is completed in as soon as possible, and the house was warm and durable.

Own technological lines, qualified personnel and the absence of intermediaries are the reasons why we always achieve high quality, low prices, we work harmoniously and efficiently.

Projects of frame houses with a terrace

Since 2008, we have mastered more than 30 standard projects frame houses, differing in appearance, area, location of premises and, of course, price. Detailed Descriptions projects, illustrated with plans and reports on already implemented objects, will help you quickly make a choice. If a suitable project is not yet in the “Russian Houses 53” catalog, we will accept the plan provided by the client.

By concluding a contract with us for the construction of a frame house, you know everything about your future home, from the material for making timber and wall cladding to color roofing material, the width of the stairs and the type of installed interior doors.

Frame houses with a terrace: project implementation

The kit for assembling a frame house is manufactured at our enterprise. All structural details and the house as a whole comply with existing standards that establish criteria for the quality and safety of residential buildings. Thanks to the accuracy of the measurements, turnkey installation of a building can last from 1 to 4 weeks, after which the house is ready for occupancy.

The peculiarity of the houses of the chosen type is the presence of a terrace, which must be strengthened with the help of durable wooden supports, fenced and hemmed with clapboard. The floor is made of tongue and groove boards, which can withstand heavy use throughout the year.

A frame house with a terrace from the Russian Houses 53 company is the sure way to a quick and profitable solution housing issue.

The veranda is one of the simplest and most useful extensions for a backyard cottage. This design looks equally good with a one-story and two-story house. It is capable of performing different functions. Even be used throughout the year.

Moreover, country houses may initially be designed with a veranda, or it may be completed later.

Types of frame verandas

There are several types of extensions. Each variety has characteristic features, which should be taken into account when choosing.

  • Capital.

Initially included in the cottage project. They are erected simultaneously with the frame of the house. They have a common foundation and a single roof. As a rule, such extensions are fully insulated and can be used in any weather. In fact, this is a full-fledged room that can be used as a bedroom, recreation room or winter garden.

  • Attached.

Attached to the cottage after completion capital construction. Has its own own foundation and your roof. It has minimal insulation or no insulation at all. It is customary to place a summer kitchen or dining room in such premises.

  • Open.

Veranda without a roof and without insulation. Ideal for the role of a gazebo. Helps save space land plot, eliminating the need to build a gazebo in the garden.

  • Glazed.

Verandas with minimal insulation and large panoramic windows. Suitable for the role of recreation rooms, winter gazebos, summer kitchens with barbecue. Glazed extensions are so successful that in warm weather All family members gather in them.

Frame houses with a veranda: key advantages

In addition, the veranda allows you to improve the thermal insulation of the house. It serves as a buffer between environment and the main building. As practice shows, the presence of such an extension increases the thermal efficiency of the cottage by 15-20%.